Please use this identifier to cite or link to this item: http://repositorio.uisek.edu.ec/handle/123456789/5021
Title: Gestión BIM del Edificio Airos, Rol Coordinador BIM
Authors: Rangel Rodriguez, Violeta Carolina
Palacios Murillo, Jamil Ignacio
Keywords: BIM
BEP
EIR
METODOLOGÍA
CONSTRUCCIÓN
ISO
Issue Date: Apr-2023
Publisher: Universidad Internacional SEK
Citation: GT - MBIM P153g/2023
Abstract: La presente tesis tiene como objetivo la implementación y aplicación de la Metodología BIM al Edificio Residencial Airos de 4.376,44 m2 ubicado al Norte de la ciudad de Quito - Sector Lomas de Monteserrín, la edificación consta de 2 subsuelos de parqueaderos con rampa para vehículos, 1 planta tipo y 5 plantas altas, área de uso comunal y terraza accesible, con la finalidad de crear un proceso eficaz en sus diferentes etapas de desarrollo del proyecto, demostrando los beneficios de este enfoque para el ciclo de vida del proyecto BIM Design. El sistema constructivo del proyecto consta de una estructura mixta compuesta de estructura metálica y hormigón armado, en el caso de las instalaciones está constituido con un sistema hidrosanitario, sistema contra incendios y de climatización, el sector cuenta con la infraestructura necesaria para la entrega de servicio básico del proyecto. El uso de la metodología le permitirá mejorar de manera eficiente los proyectos de forma rápida, la detección y la solución de conflictos a tiempo en las distintas fases del proyecto, y que la información contenida en los modelos permita la obtención de mediciones y cantidades fiables para optimizar tiempos y costos al momento de la construcción de este.
Description: The objective of this thesis is the implementation and application of the BIM Methodology to the Airos Residential Building of 4,376.44 m2 located north of the city of Quito - Lomas de Monteserrín Sector, the building consists of 2 underground parking spaces with a ramp for vehicles, 1 standard floor and 5 tall floors, communal use area, and accessible terrace, to create an efficient process in its different stages of project development, demonstrating the benefits of this approach for the life cycle of the BIM Design project. The construction system of the project consists of a mixed structure made up of a metallic structure and reinforced concrete, in the case of the facilities it is constituted of a plumbing system, a fire-fighting system, and an air conditioning system, the sector has the necessary infrastructure for the delivery of service basic of the project. The use of the methodology will allow you to efficiently improve projects quickly, the detection and resolution of conflicts on time in the different phases of the project, and the information contained in the models allows obtaining reliable measurements and quantities for Optimize times and costs at the time of its construction.
URI: http://repositorio.uisek.edu.ec/handle/123456789/5021
Appears in Collections:Maestría en Gerencia de Proyectos BIM

Files in This Item:
File Description SizeFormat 
08 JAMIL IGNACIO PALACIOS MURILLO.pdf10.8 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.