Repositorio logo
Por favor, use este identificador para citar o enlazar este ítem: https://repositorio.uisek.edu.ec/handle/123456789/5689
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorDel Villar Alburquerque, Manuel Albertoes_ES
dc.contributor.authorJaramillo Gutiérrez, David William-
dc.date.accessioned2025-10-02T15:11:50Z-
dc.date.available2025-10-02T15:11:50Z-
dc.date.issued2025-09-
dc.identifier.citationUISEK-T QMGBI J371op/2025es_ES
dc.identifier.urihttps://repositorio.uisek.edu.ec/handle/123456789/5689-
dc.descriptionEl Estado ecuatoriano ha promovido la construcción de Unidades de Policía Comunitaria (UPC) como una estrategia para fortalecer la seguridad ciudadana, replicando prototipos a nivel nacional. Sin embargo, muchos de estos proyectos han enfrentado retrasos debido a decisiones constructivas poco optimizadas y a la falta de herramientas tecnológicas en la etapa de planificación. La metodología BIM (Building Information Modeling), al integrar visualización 3D, simulación de tiempos (4D) y costos (5D), permite realizar análisis comparativos más precisos antes de ejecutar un proyecto. En este contexto, resulta pertinente aplicar BIM para simular tres metodologías constructivas —acero estructural, hormigón armado y muros portantes— en una UPC ubicada en El Carmen, Manabí. Dado que ya se dispone de información real sobre la UPC construida con muros portantes, la comparación con modelos BIM de las otras dos metodologías permitirá identificar la opción más eficiente, tanto en costos como en tiempos de ejecución. Este estudio busca aportar evidencia técnica que facilite la toma de decisiones en futuras construcciones estatales, promoviendo la eficiencia, sostenibilidad y reducción de riesgos en la gestión de proyectos públicos.es_ES
dc.description.abstractThe Ecuadorian government has promoted the construction of Community Police Units (UPC) as a strategy to strengthen citizen security, replicating prototypes nationwide. However, many of these projects have faced delays due to poorly optimized construction decisions and a lack of technological tools during the planning stage. The BIM (Building Information Modeling) methodology, by integrating 3D visualization, time (4D), and cost (5D) simulation, allows for more accurate comparative analyses before project execution. In this context, it is pertinent to apply BIM to simulate three construction methodologies—structural steel, reinforced concrete, and load-bearing walls—in a UPC located in El Carmen, Manabí. Given that real-world information is already available on the UPC built with load-bearing walls, comparing it with BIM models of the other two methodologies will identify the most efficient option, both in terms of costs and execution times. This study seeks to provide technical evidence to facilitate decision-making in future state construction projects, promoting efficiency, sustainability, and risk reduction in public project management.es_ES
dc.language.isoeses_ES
dc.publisherUniversidad Internacional SEKes_ES
dc.subjectBIMes_ES
dc.subjectCRONOGRAMASes_ES
dc.subjectPRESUPUESTOSes_ES
dc.titleOptimización de cronogramas y presupuestos en proyectos públicos mediante BIM 4D y 5D: caso UPC en Manabí, rol BIM Manageres_ES
dc.typeThesises_ES
Aparece en las colecciones: Maestría en Gerencia de Proyectos BIM

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
Jaramillo Gutiérrez David William.pdf23,56 MBAdobe PDFVisualizar/Abrir


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.