Repositorio logo
Please use this identifier to cite or link to this item: https://repositorio.uisek.edu.ec/handle/123456789/5575
Title: Gestión BIM del edificio LIB, rol líder structuras y MEP
Authors: Soria Ñunez, Luis Alberto
Morocho Collaguazo, Washington Daniel
Keywords: GERENCIA DE PROYECTOS BIM
PROYECTO
MODELO
ESTRUCTURAS
MEP
Issue Date: Apr-2025
Publisher: Universidad Internacional Sek
Citation: GT - MBIM M867ge/2025
Abstract: La implementación de la metodología BIM (Building Information Modeling) en Ecuador especialmente en el sector de la construcción se encuentra en etapa inicial de desarrollo en el ámbito privado y su uso no es generalizado en el ámbito público. Su adopción representará un cambio importante para el sector público y privado, siempre y cuando se supere desafíos como: escasez de capacitación, inversiones en tecnología, resistencia al cambio y falta de regulaciones nacionales especificación. El proyecto de titulación busca entregar una guía de implementación BIM en el ámbito de la construcción en etapa diseño y demostrar todos los beneficios que se pueden obtener a corto y largo tiempo de su adopción. El presente proyecto tiene como objetivo la implementación y aplicación de la metodología BIM en el edificio LIB, ubicado al norte de Quito, Ecuador, en el sector de Calderón. El edificio consta de 13 pisos: cuatro subsuelos, planta baja, dos pisos destinados a oficinas, cinco pisos para suites y departamentos, y una terraza. El propósito es crear un proceso eficiente en todas las etapas de desarrollo del proyecto, demostrando así los beneficios de esta metodología. El sistema constructivo del proyecto es de estructura metálica, consta con sistema hidrosanitario y eléctrico. El uso de la metodología permitirá identificar y resolver conflictos de manera más eficiente y anticipada en las distintas fases del proyecto. Además, la información obtenida de los modelos 3D proporcionará mediciones y cantidades precisas, optimizando así el tiempo y los costos
Description: The implementation of the BIM (Building Information Modeling) methodology in Ecuador, especially in the construction sector, is in the initial stage of development in the private sector and its use is not widespread in the public sphere. Its adoption will represent a major change for the public and private sector, as long as challenges such as training shortages, investments in technology, resistance to change, and lack of national regulations are overcome. The degree project seeks to provide a guide to BIM implementation in the field of construction in the design stage and demonstrate all the benefits that can be obtained in the short and long term of its adoption. The present project aims to implement and apply the BIM methodology in the LIB building, located in the northern part of Quito, Ecuador, in the Calderón sector. The building consists of 13 floors: four basements, a ground floor, two floors designated for offices, five floors for suites and apartments, and a terrace. The objective is to create an efficient process throughout all stages of project development, thereby demonstrating the benefits of this methodology. The project's construction system consists of a steel structure and includes hydro-sanitary and electrical systems. The use of the methodology will allow for the identification and resolution of conflicts more efficiently and in advance during the different phases of the project. Additionally, the information obtained from the 3D models will provide precise measurements and quantities, optimizing both time and costs
URI: https://repositorio.uisek.edu.ec/handle/123456789/5575
Appears in Collections:Maestría en Gerencia de Proyectos BIM

Files in This Item:
File Description SizeFormat 
Morocho Collaguazo Washington Daniel.pdf27,18 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.