Please use this identifier to cite or link to this item: http://repositorio.uisek.edu.ec/handle/123456789/5282
Title: Implementación BIM para el análisis energético del “Centro de monitoreo de seguridad ciudadana”, Santo Domingo: roles líder estructural & MEP
Authors: Rangel Rodriguez, Violeta Carolina
Hinojosa Sánchez, Diego Andrés
Keywords: METODOLOGÍA BIM
CONSUMO ENERGÉTICO
INTERFERENCIA DE INGENIERÍAS
PLANIFICACIÓN DE PROYECTOS
Issue Date: 18-Apr-2024
Publisher: Universidad Internacional SEK
Citation: GT - MBIM H663im/2024
Abstract: En Ecuador los diseños y construcciones de edificios públicos se construyen y diseñan mediante la metodología tradicional como es el caso de tesis ‘Centro de Monitoreo y Control para la seguridad ciudadana; este tipo de edificaciones. Para el desarrollo de la tesis se propone realizar el proyecto CMS mediante la metodología BIM analizando el modelo base en dos regiones del Ecuador, la costa y la sierra. La modificación de la envolvente del edificio tiene el objetivo de mejorar las condiciones energéticas del mismo, también, al ser un proyecto donde la interferencia entre las ingenierías tiene un papel principal, se plantea seleccionar un área del edificio donde se puedan visualizar todas estas para demostrar las ventajas de la aplicación de la metodología BIM durante el desarrollo de este tipo de edificaciones.
Description: In Ecuador, the designs and constructions of public buildings are built and designed using traditional methodology, as is the case of the thesis 'Monitoring and Control Center for Citizen Security'. For this type of buildings. For the development of the thesis, it is proposed to carry out the CMS project using the BIM methodology, analyzing the base model in two regions of Ecuador, the coast and the mountains, carrying out several scenarios where the building envelope is modified with the aim of improving energy conditions of the same. Also, being a project where interference between engineering plays a main role, it is proposed to select an area of the building where all the engineering can be visualized to demonstrate the advantages of the application of the BIM methodology during the development of this type of building.
URI: http://repositorio.uisek.edu.ec/handle/123456789/5282
Appears in Collections:Maestría en Gerencia de Proyectos BIM

Files in This Item:
File Description SizeFormat 
Hinojosa Diego.pdf46.05 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.