Please use this identifier to cite or link to this item: http://repositorio.uisek.edu.ec/handle/123456789/5231
Title: Implementación BIM proyecto polideportivo arena sport ROL LIDER DE ARQUITECTURA
Authors: Simo Curiel, Héctor Guillermo
Montalvo Raza, Kimberly Mishelle
Keywords: METODOLOGÍA
BIM
LÍDER
ARQUITECTURA
POLIDEPORTIVO
Issue Date: Apr-2024
Publisher: Universidad Internacional SEK
Citation: GT - MBIM M763im/2024
Abstract: El presente proyecto se ubica en una unidad educativa en la Provincia de Pichincha, cantón Quito, sector Valle de los Chillos-Conocoto. Cuenta con un área de terreno de aproximadamente 23.000 m2 en el cual se ha desarrollado un proyecto deportivo a través de la metodología BIM viable en tiempo y costos, tomando en cuenta aspectos de sostenibilidad. El proyecto ha sido desarrollado a través de distintos roles y profesionales siendo en este caso, el rol de arquitectura quien encabeza este documento. Como líder de arquitectura se ha trabajado aspectos del modelado arquitectónico, del diseño colaborativo y de la gestión de cambios a lo largo de todo el proyecto. Además, se ha obtenido como entregables un modelo arquitectónico profesional LOD 300, planos arquitectónicos profesionales, presupuesto de la disciplina y una programación del trabajo de arquitectura, los cuales, en conjunto con las otras disciplinas, la coordinación y la gerencia han alcanzado como resultados el mismo costo de $480.000,00 y un tiempo de ejecución BIM de 6 meses
Description: This project is located in an educational unit in the Province of Pichincha, Quito canton, Valle de los Chillos-Conocoto zone. It has a land area of approximately 23000 m2 in which a sports project has been developed through the BIM methodology, viable in time and costs, considering sustainability aspects. The project has been developed through different roles and professionals, in this case, the role of architecture who heads this document. As an architectural leader, aspects of architectural modeling, collaborative design and change management have been worked on throughout the entire project. In addition, a professional architectural model LOD 300, professional architectural plans, a budget for the discipline and a schedule of architectural work have been obtained as deliverables, which, together with the other disciplines, coordination, and management, have achieved the results same cost of $480,000.00 and a BIM execution time of 6 months.
URI: http://repositorio.uisek.edu.ec/handle/123456789/5231
Appears in Collections:Maestría en Gerencia de Proyectos BIM

Files in This Item:
File Description SizeFormat 
Montalvo Raza Kimberly Mishelle .pdf7.28 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.