Please use this identifier to cite or link to this item:
http://repositorio.uisek.edu.ec/handle/123456789/5026
Title: | Gestión BIM del edificio Chanul |
Authors: | Soria Nuñez, Luis Alberto Sarzosa Palate, Carla Estefanía |
Keywords: | BIM MANAGER METODOLOGÍA BIM FLUJO DE TRABAJO COORDINACIÓN MULTIDISCIPLINAR ISO 19650 |
Issue Date: | Mar-2023 |
Publisher: | Universidad Internacional SEK |
Citation: | GT - MBIM S251g/2023 |
Abstract: | Gestionar y planificar la elaboración del proyecto del Edificio Chanul utilizando la metodología BIM, con herramientas y softwares adecuadas para generar modelos, recorridos virtuales, renders, simulación constructiva, planos ejecutivos, presupuesto asegurando que se cumpla en el plazo de entrega y solucionar inconvenientes técnicos que se presenten en el diseño del proyecto antes de construirlo así evitando que se pierda tiempo y dinero, con un rol de BIM MANAGER siendo capaz de liderar a un equipo de trabajo tomando decisiones estratégicas con la habilidad de comunicación de todos los involucrados en el mismo, utilizando un entorno común de datos mediante una plataforma a la que todos los involucrados tengan acceso. Es un desafío en el sector de la construcción esta nueva metodología implementarla en los futuros proyectos a nivel nacional ya que es nueva y todavía no existen muchos profesionales expertos en el campo. |
Description: | Manage and plan the elaboration of the Chanul Building project using the BIM methodology, with adequate tools and software to generate models, virtual tours, renders, constructive simulation, executive plans, budget ensuring that the delivery period is met and solve technical problems that are presented in the design of the project before building it, thus avoiding wasting time and money, with a role of BIM MANAGER being able to lead a work team making strategic decisions with the communication skills of all those involved in it, using a common data environment through a platform to which everyone involved has access. It is a challenge in the construction sector to implement this new methodology in future projects nationwide since it is new and there are still not many expert professionals in the field. |
URI: | http://repositorio.uisek.edu.ec/handle/123456789/5026 |
Appears in Collections: | Maestría en Gerencia de Proyectos BIM |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
13 CARLA ESTEFANIA SARZOSA PALATE.pdf | 2.55 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.