Por favor, use este identificador para citar o enlazar este ítem: https://repositorio.uisek.edu.ec/handle/123456789/5859
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorRangel Rodríguez, Violeta Carolinaes_ES
dc.contributor.authorCuichan Yapo, Lenin Sebastian-
dc.date.accessioned2026-04-20T16:41:54Z-
dc.date.available2026-04-20T16:41:54Z-
dc.date.issued2026-02-
dc.identifier.citationUISEK-T MGBI C966im/2026es_ES
dc.identifier.urihttps://repositorio.uisek.edu.ec/handle/123456789/5859-
dc.descriptionSe plantea la aplicación de la metodología BIM en un proyecto de obra civil, con el objetivo de evidenciar los beneficios que esta metodología aporta a la planificación, gestión y control del proyecto. El proyecto contempla la construcción de una Subestación Compacta y una bodega de almacenamiento de 1.800 m², ubicadas en Tabacundo, cantón Pedro Moncayo, destinadas a mejorar la confiabilidad del sistema de subtransmisión eléctrica. La configuración adoptada integra una bodega para almacenamiento y mantenimiento de equipos eléctricos, optimizando la gestión operativa y la capacidad de respuesta ante contingencias en la red de distribución. La subestación se la realiza con estructura mixta (metálica y hormigón) y la bodega con estructura metálica; ambas instalaciones incluirán los sistemas eléctrico e hidrosanitario, y el sector dispone de la infraestructura necesaria para garantizar los servicios básicos requeridos. La implementación de la metodología BIM permitirá aumentar la eficiencia en la elaboración del proyecto, facilitando la detección y resolución temprana de conflictos en las distintas fases del desarrollo. Además, los modelos generados proporcionarán información confiable para mediciones y cantidades, contribuyendo a optimizar tiempos y costos durante la construcción.es_ES
dc.description.abstractThe application of the BIM methodology is proposed for a civil engineering project, with the objective of demonstrating the benefits this methodology provides for project planning, management, and control. The project involves the construction of a Compact Substation and a 1,800 m² storage warehouse, located in Tabacundo, Pedro Moncayo canton, aimed at improving the reliability of the electrical sub-transmission system. The adopted configuration integrates a warehouse for the storage and maintenance of electrical equipment, optimizing operational management and the capacity to respond to contingencies in the distribution network. The substation will be constructed with a mixed structure (metal and concrete), while the warehouse will have a metal structure; both facilities will include electrical and plumbing systems, and the area has the necessary infrastructure to ensure the provision of basic services required. The implementation of the BIM methodology will enhance efficiency in project development, facilitating the early detection and resolution of conflicts during the various phases of the project. Furthermore, the generated models will provide reliable information for measurements and quantities, contributing to the optimization of time and costs during construction.es_ES
dc.language.isoeses_ES
dc.publisherUniversidad Internacional SEKes_ES
dc.subjectBIMes_ES
dc.subjectBUILDING INFORMATION MODELINGes_ES
dc.subjectBIM EXECUTION PLANes_ES
dc.subjectEXCHANGE INFORMATION REQUIREMENTSes_ES
dc.subjectCOMMON DATA ENVIRONMENTes_ES
dc.titleImplementación BIM en el proyecto de la subestación nro. 77 y bodega de almacenamiento – Tabacundo: rol líder de arquitectura, especialista 5D.es_ES
dc.typeThesises_ES
Aparece en las colecciones: Maestría en Gerencia de Proyectos BIM

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
Cuichan Yapo Lenin Sebastian.pdf10,47 MBAdobe PDFVisualizar/Abrir


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.