Repositorio logo
Por favor, use este identificador para citar o enlazar este ítem: https://repositorio.uisek.edu.ec/handle/123456789/5682
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorMuñoz Hernández, Violeta Carolinaes_ES
dc.contributor.authorBustos Ramón, Byron Andrés-
dc.date.accessioned2025-09-25T16:24:59Z-
dc.date.available2025-09-25T16:24:59Z-
dc.date.issued2025-09-
dc.identifier.citationUISEK-T QMGBI B982g/2025es_ES
dc.identifier.urihttps://repositorio.uisek.edu.ec/handle/123456789/5682-
dc.descriptionEste trabajo se centra en la aplicación de la metodología BIM (Building Information Modeling) en el desarrollo del proyecto ALÓAG PARK, con el objetivo de coordinar de manera eficiente las distintas disciplinas involucradas, optimizar los procesos de diseño y ejecución, y asegurar el cumplimiento de los estándares técnicos, funcionales y estéticos definidos para el proyecto. A través de la implementación de flujos de trabajo BIM, se ha logrado integrar información relevante desde las fases tempranas del diseño, permitiendo un análisis profundo, una planificación precisa y una toma de decisiones fundamentada. Este enfoque ha facilitado la detección oportuna de interferencias, la evaluación de alternativas constructivas y la gestión eficiente de los recursos, minimizando retrabajos y mejorando la trazabilidad de cada fase del proyecto. En este contexto, el rol del Coordinador BIM ha sido fundamental para garantizar la correcta organización, revisión y validación de los modelos desarrollados por cada disciplina. Su responsabilidad principal ha sido asegurar el cumplimiento del alcance definido por el BIM Manager, promoviendo una comunicación clara entre los equipos, exigiendo las correcciones necesarias y velando por el cumplimiento de los objetivos establecidos en el BEP (BIM Execution Plan). De este modo, se ha fortalecido la gestión colaborativa y se ha promovido una ejecución más eficiente y alineada con las expectativas del cliente.es_ES
dc.description.abstractThis study focuses on the application of Building Information Modeling (BIM) methodology in the development of the ALÓAG PARK project. The primary objective is to efficiently coordinate the various disciplines involved, optimize design and construction processes, and ensure compliance with the project's defined technical, functional, and aesthetic standards. By implementing BIM workflows, relevant information has been integrated from the early design stages, enabling in-depth analysis, precise planning, and data-driven decision-making. This approach has facilitated the timely detection of clashes, evaluation of construction alternatives, and efficient resource management, minimizing rework and enhancing traceability throughout each project phase. In this context, the BIM Coordinator has played a crucial role in ensuring the proper organization, review, and validation of discipline-specific models. Their primary responsibility has been to verify compliance with the scope defined by the BIM Manager, fostering clear communication among teams, enforcing necessary corrections, and ensuring adherence to the objectives outlined in the BIM Execution Plan (BEP). As a result, collaborative management has been strengthened, promoting a more efficient execution aligned with the client’s expectations.es_ES
dc.language.isoeses_ES
dc.publisherUniversidad Internacional SEKes_ES
dc.subjectGERENCIA DE PROYECTOS BIMes_ES
dc.subjectALOAG PARKes_ES
dc.subjectBIMes_ES
dc.subjectCOORDINACIÓNes_ES
dc.subjectEFICIENCIAes_ES
dc.titleGestión BIM del Centro de Distribución y Logística Aloag Park, Rol: Coordinador BIMes_ES
dc.typeThesises_ES
Aparece en las colecciones: Maestría en Gerencia de Proyectos BIM

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
Byron Andrés Bustos Ramón.pdf3,16 MBAdobe PDFVisualizar/Abrir


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.